| Removing topsoil. |
| Digging ditch for frost wall. |
| Getting ready to pour footings. |
| Here they are. |
| Putting up forms for the frost-wall. |
| The result. |
| Back-filling frost-wall |
| Frost wall done. |
| Putting forms in the cellar hole. |
| Re-bar installed and forms getting put in place. |
| Wall forms up and ready. |
| Here is the concrete. |
| One of the men putting the anchor bolts in the wall. |
| Walls are done; getting the floor ready for concrete. |
| Covering drainage pipe with 2" crushed stone. |
| Here is how they did it. |
| A few days later. Ready for concrete. |
| The steel beams are here! |
| Pouring the floor. |
| Removing steel beams from truck. |
| Getting close. |
| Putting steel decking on steel beams. |
| Pouring the floor. |
| Before...... |
| ...after. |